In Venezuela because of the earthquake tilted dvuhsotmetrovy skyscraper MOSCOW, 22 Aug — RIA Novosti. The Minister of internal Affairs of Venezuela, Nestor Reverol said that the last five floors were unfinished skyscraper in Caracas known as the Tower of David, banked 25% after magnitude earthquake on different data from 6.3 to 7.0, reports channel NTN24. Upstairs “We are ready, because the Tower of David is an old building and it cracked on the upper floors. It could collapse at any movement”, — quotes the channel of the head of civil defense of the municipality of Libertador Hernan MATEO. Occurred in Venezuela, the earthquake was felt across the country, including in Caracas, shaking the whole building. The videos of witnesses can be seen that the walls of houses after the earthquake was covered with huge cracks and partially collapsed. La Torre David de #Caracas #Venezuela se inclinó luego de terremoto